Information On the progress of road repair work on regional roads in 2019

2 projects with a total length of 18 km in the amount of 1300.5 million tenge (RB – 607.7 million tenge, OB – 692.8 million tenge, including: 

– reconstruction of a/d Chernoretsk-Olgino-Uspenka-Sharbakty km 25-37 (12 km)

The implementation period is 2019-2020.

Allocated for 2019 – 592.5 million tenge. (OB – 333.4 million tenge, RB-259.1 million tenge).

The contract is concluded on the CMP in the amount of 1 495.2 million tenge;

The total amount of the contract for 2019 – 592.5 million tenge;

Current situation: the contract is concluded with the contractor LLP “ABK Avtodor NS”, the delivery of inert materials, bypass road device 6 km;

Created jobs for 15 people.

– reconstruction of a/d Chernoretsk-Olgino-Uspenka-Sharbakty km 37-43 (6 km).

Implementation period -2019 year.

Allocated: 708.0 million tenge. (RB-348.6 million tenge, OB-359.4 million tenge)

The contract is concluded on the CMP in the amount of 675.3 million tenge;

Current situation: the contract is concluded with the contractor LLP “ABK Avtodor NS”, the bypass road, the removal of PSP (fertile soil);

Created jobs for 15 people.

 

As part of the average repair of roads, 3 projects with a length of 59.5 km, worth 2 448.7 million tenge (RB – 2 203.9 million tenge) are implemented. OB – 244.8 million tenge), including:

– average repair of the highway kachira – Mikhailovka Russian border km 0-20 (20 km). The implementation period is 2019.

Selected: 753.5 million. tenge (RB – 678,2 mln. tenge, OB 75.3 million tenge).

The contract was signed in the amount of 664.5 million tenge.

Current situation: the contract is concluded with the contractor “Gordorstroy” LLP, the delivery of inert material is made;

Created permanent jobs for 10 people.

– average repair of the highway kachira – Mikhailovka Russian border km 20-40 (20 km).The implementation period is 2019.

Allocated: 793.0 million tenge. (RB – 713.7 million tenge, OB – 79.3 million tenge).

The contract is concluded for the sum of 699, 4 million tenge.

Current status: the contract is concluded with the contractor LLP “Gordorstroy”, works on rasklinivanie 9 km (km 40-31).

Created permanent jobs for 10 people.

– average repair of the highway kachira – Mikhailovka Russian border km 83-102,5 (19.5 km). The implementation period is 2019.

Allocated: 902.2 million tenge. (RB – 812.0 million tenge, OB – 90.2 million tenge million tenge).

Current situation: the contract is concluded with the contractor LLP “AZA”, is the delivery of inert material.

Created permanent jobs for 16 people.


09/07/2019 70